10.06 · Audit / Recommendations & roadmap
Three weeks to the read. Three months to the rebuild.
Every finding in chapters 10.01 through 10.05 maps to one of three buckets. Week 1: fixes that cost nothing and unblock the next buyer who lands. Weeks 2–4: rebuilds that change how the site converts. Months 2–3: structural moves that change how the brand is positioned. The roadmap below sequences them by impact and cost.
WEEK 1 · SHIP THESE THIS WEEK
Six fixes. No design work. No new pages.
Every item here is a copy edit or a content add. None require a designer, a developer beyond an hour, or stakeholder approval beyond Drew + Paige. They close the credibility holes the audit flagged before the next CMO lands.
WEEKS 2–4 · M1 REBUILD MILESTONES
Three new pages. One existing page upgraded.
These items require a design pass and a page build. They're the conversion-changing moves — the items that turn a curious visitor into a scoped pilot. They map to the M1 engagement milestones already on the Gameplan and use existing primitives from the marketing system.
MONTHS 2–3 · POSITIONING REBUILD
Three structural moves. One narrative win.
Beyond the M1 milestones, these moves change how the brand reads to a CMO who hasn't met Diray before. They are not cosmetic. They commit the firm to a sharper position than the homepage currently does and make the proof layer carry it.
SCORECARD · BEFORE / AFTER
What "done" looks like at the end of 90 days.
WHAT THIS AUDIT IS NOT
Three things on purpose.
- Not a redesign brief. The site is functional and the brand is intact. Every finding is a copy, structure, or conversion-path move — not a "redo the visuals" move.
- Not a critique of the work. The numbers in the case studies are real and the client relationships are deep. The audit is about how that work is presented, not whether it's good.
- Not a one-shot project. The /audit/ section is timestamped Jun 29, 2026. The site changes. The audit should be re-run quarterly. Pattern: dated chapter under the same TOC.
M1 starts Jun 29.
The Week-1 fixes above ship the first week. The M1 rebuild milestones map to the existing Gameplan weekly sprints. The Month 2–3 moves get scoped in the M1 readout on Fri Jul 24.
Open the gameplan →